To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Bihai Power Plant

From Wikipedia, the free encyclopedia

Bihai Power Plant
碧海發電廠
Map
CountryRepublic of China
LocationXiulin, Hualien County
Coordinates24°20′09″N 121°40′36″E / 24.33583°N 121.67667°E / 24.33583; 121.67667
StatusOperational
Construction began2001
Commission date10 December 2011[1]
Construction costNT$ 16.5 billion
Owner(s)Taipower
Operator(s)Taipower
Thermal power station
Primary fuelWater
Power generation
Units operational1
Make and modelTatung Company, BHEL[2]
Nameplate capacity61.2 MW
Annual net output237 GWh
External links
CommonsRelated media on Commons

The Bihai Power Plant (traditional Chinese: 碧海發電廠; simplified Chinese: 碧海发电厂; pinyin: Bìhǎi Fādiànchǎng) is a hydroelectric power plant in Xiulin Township, Hualien County, Taiwan.

YouTube Encyclopedic

  • 1/3
    Views:
    56 564
    942
    8 572 857
  • Munger - Bihar - India HD
  • Babungo - Ahnenkult für Klaus
  • Tumi Asbe Bolei

Transcription

History

The geological survey and exploratory drilling for the project were started in 1996 and construction was started in 2001. After 15 years of preparatory and construction work, the power plant went into commercial operation on 10 December 2011.[3]

Dam and reservoir

The power plant was established from the construction of concrete gravity dam at an altitude of 545 meters along the Hoping River basin in Hualien County. The dam at (24°19′59.91″N 121°36′25.48″E / 24.3333083°N 121.6070778°E / 24.3333083; 121.6070778 (Bihai Dam)) created a reservoir with a capacity of 635,000 m3. An intake valve was built connecting the dam with a 6,549 meter long headrace tunnel to Bihai Power Plant located at the downstream side at an altitude of 100 meters where a vertical Pelton turbine of 61.2 MW is installed.

Generation

The power plant is expected to generate 237 GWh every year to residents of Hualien County to relieve the previous burden for Taipower to import electricity from Mingtan Pumped Storage Hydro Power Plant in Nantou County and Maanshan Nuclear Power Plant in Pingtung County which was very costly. The 18 hours of daily water capture and storage will generate enough electricity to supply the six hours of peak load in the region.

Safety

The power plant will open the floodgate to release excessive water during high river intensity to prevent the buildup of sediment.

Financing

The project costed NT$ 16.5 billion.[citation needed]

See also

References

  1. ^ "Taiwan power companyConstruction Project". Taipower.com.tw. Archived from the original on 8 May 2014. Retrieved 26 May 2014.
  2. ^ "Bharat Heavy Electricals Ltd". Bhel.com. Retrieved 26 May 2014.
  3. ^ "Taiwan Today - Hualien hydropower plant ready to operate in October". Archived from the original on 27 May 2014. Retrieved 23 August 2014.
This page was last edited on 27 September 2023, at 15:58
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.