To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Bedford Hydropower Project

From Wikipedia, the free encyclopedia

Bedford Hydropower Project
Location of Bedford Hydropower Project in Virginia
LocationBedford County, Virginia / Amherst County, Virginia, U.S.
Coordinates37°34′24.85″N 79°22′17.53″W / 37.5735694°N 79.3715361°W / 37.5735694; -79.3715361
PurposeHydroelectric, Recreation, Fish and Wildlife Pond
StatusIn use
Owner(s)Town of Bedford, Virginia
Operator(s)Town of Bedford, Virginia
Dam and spillways
Type of damConcrete gravity
ImpoundsJames River
Height19.6 ft (6.0 m)[1]
Power Station
Operator(s)Town of Bedford, Virginia
Turbines2
Installed capacity4.5 MW
Annual generation12,284.7 MWH (2018)[2]
FERC Number: 5596

The Bedford Hydropower Project (Snowden) is a hydroelectric generation facility on the James River near the community of Big Island, Virginia. The project includes a low head structure completely spanning the river; river flow is split into a concrete canal leading to the hydroelectric generation facility and the natural river course. [3]

Dam and hydroelectric plant are located approximately one mile downstream of the larger Cushaw Hydroelectric Project; the address of the project is 7443 Elon Road (Virginia Route 130), Big Island, Virginia. This dam is the middle of three dams in rapid succession; the Big Island Dam is located several miles downstream.

The project consists of a canal along the left bank of the river leading to the buttressed power plant structure and an adjacent run of the river bypass of natural riverbed past the low head dam. A public fishing area is located at the Project upstream of the canal headgates; a canoe portage is also provided.[4]

The project is operated by the Town and is staffed at least two hours per day, seven days a week. Additionally, the plant is monitored remotely and an automated call system alerts town personnel of abnormal conditions.[5]

YouTube Encyclopedic

  • 1/3
    Views:
    3 779
    521
    448
  • Bill Williams Represents Client That Was Sucked Into An Underwater Power Plant Pipe While Diving
  • Baloo the Builder R3 Building a useful project
  • Jr FLL Showcase

Transcription

References

  1. ^ US Army Corps of Engineers National Inventory of Dams; NIDID VA00914
  2. ^ Town of Bedford, “Head Water Benefits Production for 2018 and value of production for use in head water benefits assessments under P-5596”, June 3, 2019; James River Basin, Docket No. HB68-19A-98
  3. ^ Town of Bedford, “Bedford Project – FERC 5596; Request for Modification of Minimum Flow in Bypass Reach”; May 20, 2015; FERC Accession Number 20150522-5281
  4. ^ Town of Bedford, “City of Bedford submits public safety plan under P-5596.”, November 05, 2008; FERC Accession Number 20090129-0053.
  5. ^ Town of Bedford, “Town of Bedford, VA notifies FERC that the dam is in good condition and has no recordable accidents for the Town of Bedford Hydro Project under P-5596”, December 30, 2013; FERC Accession Number 20140123-0286
This page was last edited on 5 March 2024, at 02:22
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.