To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Barsingsar Thermal Power Station

From Wikipedia, the free encyclopedia

Barsingar power station
Map
Location of the Barsingar power station
CountryIndia
LocationBarsingsar, Bikaner district, Rajasthan.
Coordinates27°51′01″N 73°12′04″E / 27.850308°N 73.20116°E / 27.850308; 73.20116
StatusOperational
Commission dateUnit 1: December, 2011
Unit 2: January, 2012
Owner(s)Neyveli Lignite Corporation
Thermal power station
Primary fuelLignite
Power generation
Units operational2 X 125 MW
Nameplate capacity250 MW

Barsingar power station project is a 250-megawatt (MW) lignite based power station operated by NLC India Limited, formerly Neyveli Lignite Corporation (NLC), located at Barsingsar in Bikaner district, Rajasthan, India.

Background

The first 125 MW was commissioned on 28 June 2010. The second 125 MW was commissioned on 25 January 2011.[1]

Lignite for the power project is being supplied from the Barsingsar Mine, which is owned and operated by NLC. The mine was commissioned in October 2009.[2]

Delays

The company was subject to a financial crunch as a result of delays in commissioning the plant. The first unit was commissioned in 2010,[2] but it was reported that as of October 2011 the unit had not reached its target output.[3] In its July 2010 annual report, NLC stated that the second unit was scheduled to be commissioned in September 2010,[2] but the second 125 MW was commissioned on 25 January 2011,[1] and a media report in late 2011 stated that "the modification works for the second unit are progressing very slowly." The media report also said the station contractor BHEL was "failing to keep its commitment that it will commence commercial operations of the Barsingar thermal power project by end of September 2011." the thermal plant declared for commercial operation during Jan. 2012, while Unit-I was declared during December 2011.[4]

References

  1. ^ a b "Thermal Units Commissioned During 2010-11," Archived 24 January 2013 at the Wayback Machine Central Electricity Authority
  2. ^ a b c "Neyveli Lignite Corporation Ltd: Directors Report", July 2010.
  3. ^ "MoC helps in speedy execution of Barsingar TPP works", AsianPower, 11 October 2011.
  4. ^ "NLC India Directors Report | NLC India Director Details".

External resources


This page was last edited on 23 December 2023, at 13:26
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.