To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Anuppur Thermal Power Project

From Wikipedia, the free encyclopedia

Anuppur Thermal Power Project
Map
CountryIndia
LocationAnuppur District, Madhya Pradesh
Coordinates23°03′54″N 81°47′07″E / 23.0651°N 81.7854°E / 23.0651; 81.7854
StatusOperational
Construction began
  • June 2015
Commission date
  • April 2016
Operator(s)Hindustan Powerprojects
Thermal power station
Primary fuelCoal
Power generation
Nameplate capacity2520 MW

The Anuppur Thermal Power Project or ATPP as popularly cited is a 2520-megawatt (MW) coal-based thermal power station located in Anuppur District, Madhya Pradesh, India. The project is being commissioned by Hindustan Powerprojects (formerly Moser Baer).

YouTube Encyclopedic

  • 1/3
    Views:
    7 557
    938 370
    7 271
  • B.Tech, Polytechnic और ITI के बाद Power Plant में जॉब कैसे पाए ? Power Plant Latest Jobs and Salary😯
  • THERMAL POWER PLANT कैसे काम करता है?
  • Madhya Pradesh Public Service Commission | Thermal Power Plant | MPPSC

Transcription

Key People

  • Ratul Puri — Company Chairman
  • Raghav Trivedi — President Thermal
  • Bashant Kumar Mishra;— Project Head

Offices

The company has its office at following places.

Delhi — Okhla Phase III

Bhopal — Rivierra Town

Anuppur — Kotma Road

Phase I

A sub-project with estimated output of 1200 MW, comprising two 600 MW subcritical units, is under construction as of June 2015. Lanco is the EPC Contractor.

Water for the project is being taken from the Son River. Coal is being procured from Coal India Limited's South Eastern Coalfields mines located in Madhya Pradesh and Chhattisgarh.

The entire operation is spread over four villages: Laharpur Murra, Guwari, Belia, and Jaithari. Environmental clearance for Phase I was received in May 2010 from MoEF Delhi.[1] Consent to Operate authorization has also been received from the Madhya Pradesh Pollution Control Board.[2]

COD achieved in May 2015 for Unit One. COD achieved in April 2016 for Unit Two.

PPA update: 70 per cent of the power being generated in the plant will be sold to Madhya Pradesh and Uttar Pradesh at tariffs between Rs. 3.60 a unit and Rs. 3.80 a unit.

Phase II

ATPP Phase II of the power project, with expected output of 1320 MW and consisting of two 660 MW super-critical units, is in pre-development phase as of January 2015. Company applied for Environmental Clearance for this second phase in April 2014.

See also

References

  1. ^ "Welcome to Environment". environmentclearance.nic.in.
  2. ^ http://www.mppcb.nic.in/

External links

Company website Hindustan Powerprojects

This page was last edited on 23 September 2023, at 16:49
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.