To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

American Creosote Works (Pensacola Plant)

From Wikipedia, the free encyclopedia

American Creosote Works (Pensacola Plant)
Superfund site
Geography
CityPensacola
CountyEscambia County
StateFlorida
Coordinates30°24′17″N 87°14′12″W / 30.404710°N 087.236660°W / 30.404710; -087.236660
American Creosote Works is located in Florida
American Creosote Works
American Creosote Works
Information
CERCLIS IDFLD008161994
ContaminantsVOCs, PAHs, Pentachlorophenol, dioxin
Responsible
parties
EPA, COE
Progress
Proposed12/30/1982
Listed09/08/1983
List of Superfund sites

The American Creosote Works Superfund site is an inactive wood-treating facility in Pensacola, Florida. The 18-acre site is located about 600 yards north of the confluence of Bayou Chico and Pensacola Bay at 701 S "J" Street.[1] The Superfund program of the United States Environmental Protection Agency (EPA) is responsible for cleaning up the nation's most contaminated land and responding to environmental emergencies, oil spills, and natural disasters.[2]

History

The plant operated from 1902 until 1981, when the company filed for bankruptcy. Before 1950, creosote was the primary wood preservative chemical, and after 1950 pentachlorophenol (PCP) became the preferred chemical. Prior to 1970, operators discharged liquid process wastes into two onsite, unlined, percolation ponds which were allowed to overflow into Bayou Chico and Pensacola Bay. Later, workers drew wastewaters off the ponds periodically and discharged them into designated "spillage areas" on site. Additional discharges occurred when heavy rainfall flooded the ponds, which then overflowed their dikes.

EPA placed the site on the Superfund program's National Priorities List (NPL) in 1983 because of contaminated soil and groundwater resulting from facility operations. [3]

As of 2017, the total cost to remedy the site was estimated to be $35.3 million. [4]

Contamination concerns

The site is in a predominantly residential area with some commercial use, directly south of the intersection of Barrancas Avenue and West Main Street.[5] Though the area is served by municipal water supplies, numerous residents and businesses operate private irrigation wells. Major contaminants in the soil, sediment, and groundwater are volatile organic compounds (VOCs), polycyclic aromatic hydrocarbons (PAHs), PCP, and dioxins and dioxin-like compounds from the former wood-treating processes.

See also

References

  1. ^ "American Creosote Works, Inc. (Pensacola Plant) Pensacola, FL Cleanup Activities". EPA. Retrieved 2021-03-04.
  2. ^ "Superfund". EPA. Retrieved 2021-03-04.
  3. ^ "American Creosote Works, Inc. (Pensacola Plant) Pensacola, FL Cleanup Activities, Background". EPA. Retrieved 2021-03-04.
  4. ^ "American Creosote Works (ACW) Superfund Site Record of Decision, August 2017, pgs 51 - 57" (PDF). EPA. Retrieved 2021-03-04.
  5. ^ "American Creosote Works, Inc. (Pensacola Plant) Pensacola, FL Cleanup Activities, Background". EPA. Retrieved 2021-03-04.


This page was last edited on 9 October 2021, at 16:31
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.