To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Ahmedabad–Pune Duronto Express

From Wikipedia, the free encyclopedia

Pune–Ahmedabad
Duronto Express
Overview
Service typeDuronto
StatusActive
LocaleGujarat & Maharashtra
First service11 March 2012; 12 years ago (2012-03-11)
Current operator(s)Central Railways
Route
TerminiAhmedabad Junction (ADI)
Pune Junction (PUNE)
Stops3
Distance travelled635 km (395 mi)
Average journey time8 hours, 40 min
Service frequency3 days a week
Train number(s)12297 / 12298
Line(s) usedAhmedabad–Mumbai main line
On-board services
Class(es)AC 1st Class, AC 2 tier,AC 3 Tier
Sleeping arrangementsYes
Catering facilitiesOn-board catering & e-catering
Observation facilitiesLarge windows in all carriages
Technical
Rolling stockLHB Duronto
Track gauge5 ft 6 in (1,676 mm) broad gauge
Operating speed72 km/h (45 mph) average,
130 km/h (81 mph) maximum

The 12297 /12298 Pune–Ahmedabad Duronto Express is an Express train of Indian Railways Duronto Express class that connects Pune Junction (PUNE) to Ahmedabad Junction (ADI).

It operates as train number 12297 from Ahmedabad Junction to Pune Junction and as train number 12298 in the reverse direction.

YouTube Encyclopedic

  • 1/1
    Views:
    160 971
  • A thrilling night journey in Duronto express

Transcription

Coach composition

The rake has nine AC 3-tier coaches, three AC 2-tier coaches, one AC First Class, and two EOG cars, making a total of fifteen coaches. It does not have a pantry car coach.

As with most train services in India, coach composition may be amended at the discretion of Indian Railways, depending on the demand.

Train details

This train had its inaugural run on 11 March 2012 and it runs with new Duronto rakes.

See also

References

External links

This page was last edited on 21 April 2024, at 17:56
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.