To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Ahmedabad–Dholera Expressway

From Wikipedia, the free encyclopedia

Ahmedabad–Dholera Expressway
अहमदाबाद–धोलेरा एक्सप्रेसवे
Map
Route information
Maintained by National Highways Authority of India (NHAI)
Length109 km (68 mi)
Existed2024–present
Major junctions
North endSarkhej, Ahmedabad
South endAdhelai, Bhavnagar
Location
CountryIndia
StatesGujarat
Major citiesAhmedabad and Bhavnagar
Highway system

Ahmedabad–Dholera Expressway[1] is a 109 km (68 mi) long, four-lane wide (expandable to eight) access-controlled under-construction expressway in Gujarat, India. It will connect Sardar Patel Ring Road near Sarkhej in Ahmedabad with Adhelai village in Bhavnagar district via Dholera Special Investment Region (DSIR). The proposed Dholera International Airport near Navagam, about 20 km (12 mi) from Dholera SIR will also lie in the route.

The Ahmedabad–Dholera greenfield expressway is a part of the Delhi–Mumbai Industrial Corridor (DMIC) and is expected to be ready by 2024.[2]

YouTube Encyclopedic

  • 1/3
    Views:
    7 671
    27 486
    57 753
  • Ahmedabad Dholera Expressway Project Details | DMIC | Dholera Smart City Highway | DSIR
  • Ahmedabad Dholera Expressway Progress | Dholera Smart City | DMIC
  • How Ahmedabad Dholera Expressway will connect India’s First Greenfield City? Expressways

Transcription

Construction

The NHAI has divided the construction work of Ahmedabad–Dholera Expressway into four packages. Its total construction cost (excluding the cost of land) is about 3,196 crores.

The list of contractors is as follows:

Sr. No Package Length in km Contractor
1. Sarkhej (Ahmedabad)–Sindhrej (Ahmedabad) 22.0 Sadbhav Engineering
2. Sindhrej (Ahmedabad)–Vejalaka (Ahmedabad) 26.5 Sadbhav Engineering
3. Vejalaka (Ahmedabad)–Dholera SIR (Ahmedabad) 22.5 GHV India
4. Dholera SIR (Ahmedabad)–Adhelai (Bhavnagar) 38.0 DRA Infracon

Status updates

References

  1. ^ "Ahmedabad–Dholera Expressway gets green signal, Tenders issued". The Times of India. 1 January 2019.
  2. ^ "After Delhi-Mumbai Expressway, focus is now on Ahmedabad-Dholera project". mint. 15 February 2023. Retrieved 10 November 2023.
  3. ^ "NHAI floats tenders for Ahmedabad–Dholera greenfield alignment". Construction Week Online. 8 April 2020.
  4. ^ "Sadbhav declared lowest bidder for two highway projects worth Rs 1,572 crores". Business Standard. 13 August 2020.
  5. ^ "Ahmedabad Dholera Expressway Route Map, Cost, Progress, and More - Infra Info Hub". 9 January 2024. Retrieved 29 January 2024.
This page was last edited on 29 January 2024, at 06:53
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.