To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

2006 Argentine nuclear reactivation plan

From Wikipedia, the free encyclopedia

The 2006 Argentine nuclear reactivation plan is a project to renew and reactivate the development of nuclear power in Argentina. The main points of the plan were announced by the Argentine government through Planning Minister Julio de Vido during a press conference on 23 August 2006.[1][2] They include:

  • Finishing the incomplete Atucha II Nuclear Power Plant, which was started on July 14, 1981. Construction was halted in 1994, and resumed in late 2006. Atucha II was scheduled to start up in 2012.[3] The plant began to produce energy on June 27, 2014.[4] It reached its first criticality on June 3, 2014; the first grid connection was on June 25, 2014; the first commercial operation began on May 26, 2016.
  • Researching the feasibility of the construction of a fourth nuclear plant in Argentina.
  • Extending the operational life of the Embalse power plant, originally projected to end in 2011.
  • Resuming the domestic production of enriched uranium. The reactor has a net capacity of 693 MWe and a gross capacity of 745 MWe.
  • Working on a prototype CAREM, a low-power nuclear reactor[5] which could also be installed in one of the TR-1700 class submarines currently under construction.

In 2010, an agreement was signed with Atomic Energy of Canada Limited (AECL) for the construction of Atucha III Nuclear Power Plant and the upgrade of Embalse [6] A C$440m contract was signed in August 2011 for the refurbishment of Embalse from November 2013, which will add 25–30 years to its life.

YouTube Encyclopedic

  • 1/3
    Views:
    756
    3 313
    6 820
  • Taking Children as a Tactic of Terror in the Americas
  • Aga Khan Program Lecture: Samia Henni
  • Blue Sky Uranium Advances Argentina's Largest Uranium District

Transcription

References

  1. ^ de Vido, Julio (23 August 2006). "Reactivación de la Actividad Nuclear en la Republica Argentina" (in Spanish). Comision Nacional de Energia Atomica (CNEA). Archived from the original on 2011-09-25. Retrieved 23 September 2011.
  2. ^ La Nación. 24 August 2006. Lanzó el Gobierno un plan de impulso a la energía nuclear.
  3. ^ Valente, Marcela (8 September 2011). "Against the Current in Nuclear Energy". IPS. Archived from the original on 13 October 2011. Retrieved 23 September 2011.
  4. ^ La Central Nuclear Néstor Kirchner -Atucha II- comenzó a generar energía Archived July 15, 2014, at the Wayback Machine
  5. ^ INVAP, CAREM Project Archived 2009-02-05 at the Wayback Machine.
  6. ^ Ylarri, Pedro (13 March 2010). "Avanza Atucha III, un negocio de más de US$ 3 mil millones" (in Spanish). Archived from the original on 3 March 2016. Retrieved 14 April 2010.
This page was last edited on 31 March 2023, at 11:44
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.