To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Project planning

From Wikipedia, the free encyclopedia

Project planning is part of project management, which relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment.[1] Project planning can be done manually or by the use of project management software.[2]

YouTube Encyclopedic

  • 1/3
    Views:
    199 681
    18 759
    15 669
  • Project Planning Process: 5 Steps To Project Management Planning
  • Project Planning Template: How To Develop A Basic Project Planning Template
  • Project Planning Tips: Using "To Do Lists" vs. "Project Plans"

Transcription

Description

Initially, the project scope is defined and the appropriate methods for completing the project are determined. Following this step, the durations for the various tasks necessary to complete the work are listed and grouped into a work breakdown structure. Project planning is often used to organize different areas of a project, including project plans, workloads and the management of teams and individuals. The logical dependencies between tasks are defined using an activity network diagram that enables identification of the critical path. Project planning is inherently uncertain as it must be done before the project is actually started. Therefore, the duration of the tasks is often estimated through a weighted average of optimistic, normal, and pessimistic cases. The critical chain method adds "buffers" in the planning to anticipate potential delays in project execution.[3] Float or slack time in the schedule can be calculated using project management software.[4] Then the necessary resources can be estimated and costs for each activity can be allocated to each resource, giving the total project cost. At this stage, the project schedule may be optimized to achieve the appropriate balance between resource usage and project duration to comply with the project objectives. Once established and agreed, the project schedule becomes what is known as the baseline schedule. Progress will be measured against the baseline schedule throughout the life of the project. Analyzing progress compared to the baseline schedule is known as earned value management.[5]

The inputs of the project planning phase 2 include the project charter and the concept proposal. The outputs of the project planning phase include the project requirements, the project schedule, and the project management plan.[6]

See also

References

  1. ^ Harold Kerzner (2003). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (8th ed.). Wiley. ISBN 0-471-22577-0.
  2. ^ Heße, Robert (2023-04-08). "PROJECT MANAGEMENT DEMYSTIFIED" (in German). Retrieved 2023-06-11.
  3. ^ "Definition of project planning methodologies with examples". Retrieved 24 April 2014.
  4. ^ Richard H. Thayer, Edward Yourdon (2000). Software Engineering Project Management (2nd ed.). Wiley-IEEE Computer Society Press. ISBN 0-8186-8000-8.
  5. ^ Fleming, Quentin (2005). Earned Value Project Management (Third ed.). Project Management Institute. ISBN 1-930699-89-1.
  6. ^ Filicetti, John, Project Planning Overview, PM Hut (Last accessed 8 November 2009).

External links

This page was last edited on 25 April 2024, at 13:19
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.