To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Pittsburg Center station

From Wikipedia, the free encyclopedia

Pittsburg Center
A railcar at a railway station in the center of a highway
Westbound train at Pittsburg Center in May 2018
General information
Location2099 Railroad Avenue
Pittsburg, California
Coordinates38°01′06″N 121°53′25″W / 38.018227°N 121.890178°W / 38.018227; -121.890178
Owned bySan Francisco Bay Area Rapid Transit District
Line(s)BART E-Line (eBART)
Platforms1 island platform
Tracks2
ConnectionsBus transport Tri Delta Transit: 380, 381, 391[1]
Construction
Structure typeTrench cut
Parking262 spaces[2]
Bicycle facilitiesYes
AccessibleYes
History
OpenedMay 26, 2018 (2018-05-26)
Passengers
2024467 (weekday average)[3]
Services
Preceding station Bay Area Rapid Transit Following station
Pittsburg/​Bay Point Yellow Line (eBART) Antioch
Terminus
Location
Map

Pittsburg Center station is a Bay Area Rapid Transit station on the Yellow Line.[4] It is located at the Railroad Avenue overpass of Highway 4 in Pittsburg, California and serves the downtown area of about one mile (1.6 km) away via connecting buses provided by Tri Delta Transit. There is no reserved parking available at this station.[2]

YouTube Encyclopedic

  • 1/5
    Views:
    4 669
    1 656
    37 024
    1 128
    35 310
  • BART's Opening Day Trip Onto New Antioch Extension
  • Hillcrest BART Station located in Antioch, Ca
  • BART's Complete Trip from Pittsburg/Bay Point to MacArthur
  • BART's Opening Day Trip from New Antioch Extension
  • BART's Complete Trip from MacArthur to Pittsburg/Bay Point

Transcription

History

The station under construction in 2016

Construction of the station was uncertain at the time of eBART's approval due to lack of available funds.[5] The station was originally known as Railroad Avenue during planning.[6] The city later chose Pittsburg Civic Center, which BART rejected because of its similarity to Civic Center/UN Plaza station. In January 2015, the city accepted BART's proposal of Pittsburg Center.[7]

Funding for the station was secured in early 2015 and was estimated at $11.9 million (equivalent to $16 million in 2023). Construction commenced on July 27, 2015,[8] and was opened with the rest of the line on May 26, 2018.[5]

As of February 2024, Pittsburg Center was the least-used station on the BART system, with 467 daily boardings.[3] As of 2024, BART indicates "significant market, local support, and/or implementation barriers" that must be overcome to allow transit-oriented development on the surface parking lots at the station. Such development would not begin until at least the mid-2030s.[9]

References

  1. ^ "System Map". Tri Delta Transit. 2022. Retrieved January 5, 2023.
  2. ^ a b Coetsee, Rowena (January 5, 2018). "Signups for reserved eBART parking in Antioch start Jan. 16". East Bay Times. Retrieved January 7, 2018.
  3. ^ a b "Monthly Ridership Reports". San Francisco Bay Area Rapid Transit District. February 2024.
  4. ^ "East Contra Costa BART Extension (eBART)". BART. 2010. Retrieved April 2, 2013.
  5. ^ a b Gartrell, Nate (January 22, 2015). "Pittsburg secures last piece of funding for eBART, expect new station in 2018". Contra Costa Times. Digital First Media. Retrieved April 21, 2016.
  6. ^ PBS&J (September 2008). East Contra Costa BART Extension (eBART) Draft Environmental Impact Report. San Francisco Bay Area Rapid Transit District.
  7. ^ "Pittsburg BART station name back in council's hands". East Bay Times. April 9, 2015.
  8. ^ "Pittsburg Center BART Station Groundbreaking" (PDF). BART and Contra Costa Transportation Authority. July 17, 2015. Archived from the original (PDF) on June 12, 2018. Retrieved April 21, 2016.
  9. ^ BART Transit-Oriented Development Program Work Plan: 2024 Update (PDF). San Francisco Bay Area Rapid Transit District. March 2024. p. 17.

External links


This page was last edited on 15 May 2024, at 00:12
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.