To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

National Enrichment Facility

From Wikipedia, the free encyclopedia

The National Enrichment Facility (NEF) is a nuclear facility for the enrichment of uranium associated with the Los Alamos National Laboratory. The plant uses a gas centrifuge technology known as Zippe-type centrifuges. It is located 5 miles (8.0 km) east of Eunice, New Mexico.[1] The NEF is operated by Louisiana Energy Services (LES), which is in turn owned by the Urenco Group.[2] As of 2011, LES operates as URENCO USA.

NEF employs a new type of license, the 10 CFR Part 2. It is a combination license granted by the Nuclear Regulatory Commission (NRC) allowing the plant to proceed directly from construction to operation. First of its kind, this means NEF will be closely watched by many parties in the nuclear community.

The original proposed budget was US$1.5 billion, but this increased to US$3 billion for an enlarged facility capable of 5.9 million SWU at full capacity.[3]

Since the Dedication Ceremony in October 2008, the company has grown to 236 employees with an annual payroll of US$23 million. At full capacity, NEF can provide 50% of the current enriched uranium demand for civilian nuclear power plants in the U.S.[3] The NEF commenced operations in June 2010.[4]

It is located in an area known as "nuclear alley", which also includes the Waste Isolation Pilot Plant and Waste Control Specialists.

YouTube Encyclopedic

  • 1/3
    Views:
    358 562
    41 479
    8 722
  • Going Nuclear - Part 6 - Uranium Enrichment
  • Natanz Enrichment Complex - Iran
  • Fordow Fuel Enrichment Plant - Iran

Transcription

Timeline

  • 23 June 2006: LES was granted license to commence building the facility.
  • 29 August 2006: Groundbreaking ceremony takes place at the NEF site.
  • 22 October 2008: Dedication ceremony
  • 15 February 2009: First shipment of Uranium hexafluoride for acceptance testing
  • 10 June 2010: Received authorization to bring UF6 feed stock on-site
  • 13 June 2010: First shipment of UF6 feed material arrives on-site
  • 25 June 2010: Enrichment of UF6 officially begins in Cascade #1
  • 14 August 2012: First cascade of phase II started up
  • January 2013: Phase I of construction officially complete

References

  1. ^ "Louisiana Energy Services (LES) Gas Centrifuge Facility". nrc.gov. United States Nuclear Regulatory Commission. Archived from the original on 30 July 2012. Retrieved 27 September 2022.
  2. ^ "Inauguration of Urenco's US enrichment plant - Nuclear Engineering International". www.neimagazine.com. Retrieved 2021-09-13.
  3. ^ a b The LES Story Looking Forward: Innovative Energy Commercialization Opportunities (PDF), Louisiana Energy Services, April 16, 2009, retrieved 2009-06-27
  4. ^ Commencement of operations, archived from the original on 2014-12-25, retrieved 2011-08-14

External links

32°26′08″N 103°04′47″W / 32.4356°N 103.0796°W / 32.4356; -103.0796

This page was last edited on 21 December 2023, at 14:37
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.