To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Manteca Transit Center

From Wikipedia, the free encyclopedia

Manteca Transit Center
General information
Location220 Moffat Boulevard
Manteca, California
Coordinates37°47′42″N 121°12′56″W / 37.795033°N 121.215690°W / 37.795033; -121.215690
Operated byManteca Transit
San Joaquin RTD
Stanislaus Regional Transit Authority
Line(s)UPRR Fresno Subdivision
Platforms1 side platform (planned)[1]
Tracks1 (+1 planned)
Construction
ParkingYes
AccessibleYes
History
OpenedAugust 6, 2013[2]
Opening2026 (ACE)
Future services
Preceding station Altamont Corridor Express Following station
2026
Lathrop/Manteca
toward San Jose
San Jose – Ceres Ripon
toward Ceres
North Lathrop Valley Rail
Location
Map

The Manteca Transit Center is the primary public transit hub of Manteca, California. The bus station features five bus bays with Manteca Transit as the primary operator; the agency also maintain their offices at the facility. San Joaquin Regional Transit District and Altamont Corridor Express shuttle routes also serve the transit center. Modesto Area Express (now Stanislaus Regional Transit Authority) service began in July 2020.[3] Altamont Corridor Express commuter rail service is expected to commence at a newly constructed platform along the Union Pacific rail line by 2026.[4][5][6][7]

YouTube Encyclopedic

  • 1/2
    Views:
    1 494 712
    91 697
  • 10 Places in California You Should NEVER Move To
  • He Failed Driving Test Instantly

Transcription

References

  1. ^ "Final Environmental Impact Report: Appendix C-8 - Prelim Engineering Plans" (PDF). SJRRC. Retrieved June 11, 2019.[dead link]
  2. ^ "Project Status Report". City of Manteca.
  3. ^ "Modesto bus service may start July 1 from downtown Manteca". Manteca Bulletin. May 5, 2020.
  4. ^ "Draft Environmental Impact Report". ACE. Retrieved May 13, 2020.[permanent dead link]
  5. ^ Wyatt, Dennis (April 6, 2021). "MORE TRANSIT CENTER PARKING ON MOFFAT". Manteca Bulletin. Retrieved April 7, 2021.
  6. ^ Holland, John (July 11, 2022). "Turlock commuter train extension gets another $57 million. When will cars start rolling?". The Modesto Bee. Retrieved October 30, 2022.
  7. ^ Holland, John (March 13, 2023). "ACE rail expansion runs late, just as Modesto readies its historic downtown depot". Modesto Bee. Retrieved March 13, 2023.


This page was last edited on 10 January 2024, at 07:11
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.