To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

List of coal-fired power stations in Vietnam

From Wikipedia, the free encyclopedia

About 20 GW of power stations in Vietnam are coal-fired.[1] In 2019 coal-fired power stations generated almost 40% of Vietnams electricity and about a quarter of the coal was imported.[2]

Source: Initial query from Coal Tracker,[3] updated with data from MOIT 2019 Report 58/BC-CBT,[4] updated using press releases, updated from PDP 7A [5]

Power plants (with units) Other names Sponsor Capacity (MW) Status Province Commission date Source Note
An Khanh – Bac Giang Luc Nam power station An Khanh – Bac Giang Thermoelectric Joint Stock Company 650 pre-permit Bac Giang 2023 MOIT Report 58/BC-CBT annex row V.4
An Khanh 1 Khanh Hoa power station An Khanh Electricity JSC 2x58 operating Thai Nguyen 2015 [6]
Cam Pha Phase I-II Vietnam National Coal and Mineral Industries Group 2x340 operating Quang Ninh 2011 [7]
Cao Ngan Vietnam National Coal and Mineral Industries Group 2x57.5 operating Thai Nguyen 2006 [8]
Cong Thanh Cong Thanh Thermal Power Joint Stock Company 600 permitted Thanh Hoa 2024 MOIT Report 58/BC-CBT annex row V.3
Dong Nai Formosa Unit 1–2 Hung Nghiep Formosa 2x150 operating Dong Nai 2004 [9]
Dong Nai Formosa Unit 3 Hung Nghiep Formosa 150 operating Dong Nai 2018 [10]
Duc Giang – Lao Cai Chemical Duc Giang – Lao Cai Chemicals Joint Stock Company 2x50 pre-permit Lao Cai 2020 [11]
Dung Quat Special Economic Zone (J-Power) Phase I-II J-Power 2400 & 2000 announced Quang Ngai 2028–2030 [12]
Duyen Hai 1 Electricity of Vietnam 2x622 operating Tra Vinh 2015 [13]
Duyen Hai 2 Janakuasa SDN BHD 2x600 construction Tra Vinh 2021–2022 MOIT Report 58/BC-CBT annex row IV.3
Duyen Hai 3 Extension Electricity of Vietnam 660 construction Tra Vinh 2019 MOIT Report 58/BC-CBT annex row I.9
Duyen Hai 3 Electricity of Vietnam 2x622 operating Tra Vinh 2016 MOIT Report 58/BC-CBT annex row I.4
Ha Tinh Formosa Plastics Steel Complex Unit 1,2,5,6,7,10 Formosa Ha Tinh Hung Nghiep Formosa Ha Tinh 6x150 operating: Unit 1,2,5

pre-permit: Unit 6,7,10

Ha Tinh 2015–2020 [14]
Hai Duong Hai Duong BOT plant JAKS Resources, China Power Engineering Consulting Group 2x600 construction Hai Duong 2021 MOIT Report 58/BC-CBT annex row IV.2
Hai Ha CHP 1–4 Dong Phat Hai Ha (CHP) Texhong Hai Ha Industrial Park Co. 2100 pre-permit Quang Ninh 2019–2030 MOIT Report 58/BC-CBT annex row V.2
Hai Phong 1–2 EVN Genco No 2 4x300 operating Hai Phong 2011–2014 [15]
Hai Phong 3 Unit 1–2 Vietnam National Coal and Mineral Industries Group 2x600 pre-permit Hai Phong 2028–2029 MOIT Report 58/BC-CBT annex row III.4
Lee & Man Lee & Man Vietnam Paper Limited Company 50 & 75 operating Hau Giang 2018 [16]
Long An Phase I no investor 2x600 announced Long An MOIT Report 58/BC-CBT annex row VI.1
Long An Phase II no investor 2x800 announced Long An MOIT Report 58/BC-CBT annex row VI.2
Long Phu 1 PetroVietnam Power Corp 2x600 construction Soc Trang 2023–2024 MOIT Report 58/BC-CBT annex row II.2
Long Phu 2 Tata Group 2x660 pre-permit Soc Trang 2029–2030 MOIT Report 58/BC-CBT annex row IV.8
Long Phu 3

BANPU – THAILAND

Soc Trang announced 2x600 MOIT Report 58/BC-CBT annex row II.4
Mao Khe Vietnam National Coal and Mineral Industries Group 2x220 operating Quang Ninh 2013 [17]
Mong Duong 1 Electricity of Vietnam 2x540 operating Quang Ninh 2015 [18]
Mong Duong 2 AES-VCM Mong Dong Power Co Ltd 2x620 operating Quang Ninh 2015 [18]
Na Duong 1 Vietnam National Coal and Mineral Industries Group 2x55 operating Lang Son 2005 [19]
Na Duong 2 Vietnam National Coal and Mineral Industries Group 110 construction Lang Son 2022 MOIT Report 58/BC-CBT annex row III.1
Nam Dinh 1 Hai Hau power station Taekwang Vina Industry Joint Stock Company, First National Operation & Maintenance Co. (NOMAC) 2x600 permitted Nam Dinh 2024–2025 MOIT Report 58/BC-CBT annex row IV.4
Nghi Son 1 EVN Genco No 1 2x300 operating Thanh Hoa 2013–2014 [20]
Nghi Son 2 Korean Electric Power Corporation and Marubeni Group 2x600 construction Thanh Hoa 2022 MOIT Report 58/BC-CBT annex row IV.5
Ninh Binh Ninh Binh Thermal Power JSC 4x25 operating Ninh Binh 1974 [21]
Nong Son 1 Vietnam National Coal and Mineral Industries Group 30 operating Quang Nam 2014 [22]
Pha Lai 1 Pha Lai Thermal Power JSC 4x110 operating Hai Duong 1986
Pha Lai 2 Pha Lai Thermal Power JSC 2x300 operating Hai Duong 2001
Quang Ninh 1–2 Quang Ninh Thermal Power JSC 2x300 operating Quang Ninh 2009–2014 [23]
Quang Ninh 3 no investor 2x600 announced Quang Ninh MOIT Report 58/BC-CBT annex row VI.4
Quang Trach 1 Electricity of Vietnam 2x600 permitted Quang Binh 2022–2023 MOIT Report 58/BC-CBT annex row I.17
Quang Trach 2 Electricity of Vietnam 2x600 announced Quang Binh 2026 MOIT Report 58/BC-CBT annex row I.18
Quang Tri 1 EGAT International (EGATi) 2x660 pre-permit Quang Tri 2026–2027 MOIT Report 58/BC-CBT annex row IV.11
Quang Tri 2 Korea Western Power Co 2x600 announced Quang Tri 2024 [24]
Quynh Lap 1 Vietnam National Coal and Mineral Industries Group 2x600 permitted Nghe An 2026 MOIT Report 58/BC-CBT annex row III.3
Quynh Lap 2 POSCO 2x600 announced Nghe An 2027–2028 MOIT Report 58/BC-CBT annex row IV.14
Rang Dong cogeneration 100 announced 2025 PDP 7A Decision 428/QD-TTg annex 1 Table 2, "Projects in operation from 2025" row 4
Son Dong Vietnam National Coal and Mineral Industries Group 2x110 operating Bac Giang 2009 [25]
Song Hau 1 PetroVietnam Power Corp 2x600 construction Hau Giang 2021 MOIT Report 58/BC-CBT annex row II.3
Song Hau 2 Toyo Engineering & Construction 2x1000 permitted Hau Giang 2024 MOIT Report 58/BC-CBT annex row IV.7
Tan Phuoc 1 Electricity of Vietnam 2x600 announced Tien Giang MOIT Report 58/BC-CBT annex row I.15
Tan Phuoc 2 Electricity of Vietnam 2x600 announced Tien Giang MOIT Report 58/BC-CBT annex row I.16
Thai Binh 1 Electricity of Vietnam 2x300 operating Thai Binh 2017 MOIT Report 58/BC-CBT annex row I.5
Thai Binh 2 PetroVietnam Power Corp 2x600 construction Thai Binh 2021–2022 MOIT Report 58/BC-CBT annex row II.1
Thai Binh 3 Vietnam National Coal and Mineral Industries Group 440 announced Thai Binh [26]
Thang Long Le Loi power station Hanoi Export-Import Company 2x300 operating Quang Ninh 2017–2018 MOIT Report 58/BC-CBT annex row V.1
Uong Bi I extension EVN Genco No 1 300 operating Quang Ninh 2007 [27]
Uong Bi I EVN Genco No 1 50 & 55 operating Quang Ninh 1975–1976 [27] retire in 2021
Uong Bi II extension EVN Genco No 1 330 operating Quang Ninh 2014 [27]
Van Phong 1 Sumitomo Corporation 2x660 permitted Khanh Hoa 2023–2024 MOIT Report 58/BC-CBT annex row IV.10
Vedan Vietnam Cogeneration Vedan Vietnam JSC 60 operating Dong Nai 2015 [28]
Vinh Tan 1 China Southern Power Grid, Vinacomin 2x600 operating Binh Thuan 2018–2019 MOIT Report 58/BC-CBT annex row IV.1
Vinh Tan 2 EVN Genco No 3 2x622 operating Binh Thuan 2014 [29]
Vinh Tan 3 OneEnergy, EVN, and Pacific Group 3x660 pre-permit Binh Thuan 2024–2025 MOIT Report 58/BC-CBT annex row IV.9
Vinh Tan 4 extension Vinh Tan-4 extension Electricity of Vietnam 600 construction Binh Thuan 2019 MOIT Report 58/BC-CBT annex row I.12
Vinh Tan 4 Electricity of Vietnam 2x600 operating Binh Thuan 2017–2018 MOIT Report 58/BC-CBT annex row I.6
Vung Ang 1 PetroVietnam Power Corp 2x600 operating Ha Tinh 2014–2015 [30]
Vung Ang 2 OneEnergy Co. 2x600 permitted Ha Tinh 2023–2024 MOIT Report 58/BC-CBT annex row IV.6
Vung Ang 3 Samsung Construction & Trading Corporation 2x600 shelved Ha Tinh 2031 MOIT Report 58/BC-CBT annex row IV.13
Vung Ang 3 2x600 announced PDP 7A :  Reserve power plants for renewable energy power stations’ failure of schedule and output expected

Notes

  • Announced: Projects that are in the planning decision of the government or companies but have not yet obtained a permit or permission for land use rights, coal supply rights...[31]
  • Pre-permit development: Projects have started to implement one of the following items: environmental licenses, land and water use rights, financial security, transmission contract guarantees, etc.[31]
  • Permitted: Projects that have been licensed for environmental licenses but have not yet begun to break ground.[31]
  • Construction: Projects are being built after the groundbreaking ceremony.[31]
  • Shelved: Projects do not have specific information on the project's progress but do not have enough information to declare the project cancelled.[31]
  • Operating: Projects with an official date of Commercial Operation Date (COD).[31]

Sources

  • Boom and Bust 2021: Tracking The Global Coal Plant Pipeline (Report). Global Energy Monitor. 5 April 2021.

References

  1. ^ "Vietnam prepares to rein in coal-power growth". www.argusmedia.com. 6 August 2020. Retrieved 2 October 2020.
  2. ^ "Powering Vietnam". Bangkok Post. Retrieved 21 March 2020.
  3. ^ "Global Coal Plant Tracker | End Coal". endcoal.org.
  4. ^ Hoàng, Quốc Vượng (4 June 2019). "MOIT Report 58/BC-CBT on the Implementation Progress of Power Projects in the Revised PDP7". vepg.vn.
  5. ^ Nguyễn, Tấn Dũng (18 March 2016). "PM Decision 428/QĐ-TTg on the Approval of the Revised National Power Development Master Plan for the Period of 2011–2020 with the Vision to 2030". vepg.vn.
  6. ^ "An Khanh power station". Global Energy Monitor. Retrieved 2 October 2020.
  7. ^ "Cam Pha power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  8. ^ EVN (2016). "Vietnam Electricity Annual Report 2016" (PDF). evn.com.vn.
  9. ^ Phương Thảo (26 October 2016). "Giải quyết khó khăn của Formosa theo đúng quy định của Chính phủ". moit.gov.vn.
  10. ^ Nguyễn, Anh Tuấn (2 April 2018). "Giấy phép hoạt động điện lực" (PDF). erav.vn.
  11. ^ "Duc Giang – Lao Cai Chemicals power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  12. ^ "Japan company proposes building a power plant in Quang Ngai". VOV – VOV Online Newspaper. 14 April 2017. Retrieved 1 July 2019.
  13. ^ "Duyen Hai Power Generation Complex – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  14. ^ Lê Thuý (8 November 2016). "Formosa đã nhập gần 668.000 tấn than". thoibaokinhdoanh.vn.
  15. ^ "Hai Phong Thermal Power Station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  16. ^ Lê Dân (3 April 2019). "Nhà máy nhiệt điện Lee & Man sử dụng than chứ không phải 'nhiệt điện sinh khối'". tuoitre.vn.
  17. ^ "Nhà máy nhiệt điện Mạo Khê", Wikipedia tiếng Việt (in Vietnamese), 23 April 2017, retrieved 1 July 2019
  18. ^ a b "Mong Duong power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  19. ^ "Na Duong power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  20. ^ "Nghi Son power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  21. ^ "Nhà máy nhiệt điện Ninh Bình", Wikipedia tiếng Việt (in Vietnamese), 13 April 2018, retrieved 1 July 2019
  22. ^ "Nong Son power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  23. ^ "Quang Ninh power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  24. ^ Nhịp cầu đầu tư (20 January 2017). "Hàn Quốc xây nhà máy nhiệt điện chạy than tại Quảng Trị". icon.com.vn.
  25. ^ "Son Dong power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  26. ^ H.H (20 July 2018). "Chính thức triển khai đầu tư xây dựng Nhà máy nhiệt điện tại Thái Bình". VINACOMIN.
  27. ^ a b c "Uong Bi power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  28. ^ Quyên Lưu (10 November 2016). "Vedan cần 31.500 tấn than mỗi tháng cho Nhà máy điện". moit.gov.vn.
  29. ^ "Vinh Tan power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  30. ^ "Vung Ang power station – SourceWatch". www.sourcewatch.org. Retrieved 1 July 2019.
  31. ^ a b c d e f "End Coal | Frequently Asked Questions". End Coal. Retrieved 6 August 2019.
This page was last edited on 29 April 2024, at 19:54
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.