To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Line D (Prague Metro)

From Wikipedia, the free encyclopedia

Map of metro Line D
Line D
Náměstí Míru
Botič
Náměstí bratří Synků
Pankrác
Olbrachtova
Kunratický potok
Nádraží Krč
Prague Esko
Nemocnice Krč
Nové Dvory
Libuš
Písnice
Písnice depot
Depo Písnice

Line D (Czech: Linka D) is an under construction line of the Prague Metro, which will serve Prague 4 and Prague 12 in the south of the Czech capital. Construction began on the first part of the line in 2022.

YouTube Encyclopedic

  • 1/3
    Views:
    6 027
    536
    498
  • The Lost Metro Line - Prague D Metro Line
  • I Visited Every Prague Metro Station - Part 3
  • World Metro Systems: Prague Metro

Transcription

History

Construction of Line D connecting Náměstí Míru with Nové Dvory area was previously intended to start in 2010.[1] An alternative was proposed in 2012, without building a transfer station at Pankrác, and instead sharing Line C between Nádraží Holešovice and Pankrác.[2] The construction of the line was approved by the city of Prague in 2013, and was initially planned to be built between 2017 and 2022. The project involves 10.5 kilometres (6.5 mi) of track with 10 stations, connecting Náměstí Míru and Depo Písnice.[3] The cost was initially estimated at least at 25 billion CZK,[3] in 2018 the cost increased to 43 billion CZK and in 2020 to 73 billion CZK.[4] In July 2015, it was decided that the line will be driverless.[5]

Construction work on the Pankrác – Olbrachtova section began in 2021 and is planned to finish in 2023.[4] Opening of Pankrác – Písnice part is planned for 2031.[4] In addition to the phase from Pankrác to Písnice, second phase of Line D will also lead from Pankrác to Náměstí Míru.[6]

Stations

  • Náměstí Míru (transfer to Line A)
  • Náměstí bratří Synků
  • Pankrác (transfer to Line C)
  • Olbrachtova
  • Nádraží Krč (Praha-Krč railway station)
  • Nemocnice Krč (Thomayer hospital)
  • Nové Dvory
  • Libuš
  • Písnice
  • Depo Písnice

References

  1. ^ "Prague 4 targeted for expansion". The Prague Post. 16 August 2000. Archived from the original on 6 January 2014. Retrieved 6 January 2014.
  2. ^ "City Hall rethinks line D". The Prague Post. 20 June 2012. Archived from the original on 6 January 2014. Retrieved 6 January 2014.
  3. ^ a b "Prague plans new metro line to serve southern suburbs". Radio Prague. 9 October 2013. Retrieved 6 January 2014.
  4. ^ a b c "Prager Metro: Bau der neuen Linie D nimmt Konturen an". Radio Prague. 15 June 2020. Retrieved 15 June 2020.
  5. ^ "Na nové trase metra budou jezdit vlaky bez strojvůdce, rozhodli radní". iDNES.cz (in Czech). Mafra. Czech News Agency. 21 July 2015.
  6. ^ Pavec, Michal (13 June 2017). "Přestup na Pankráci s novou tváří. Za pár měsíců se může stanice úplně změnit". Lidové noviny (in Czech). Mafra.

External links

This page was last edited on 14 May 2024, at 03:27
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.