Hyderabad BRTS | |
---|---|
Overview | |
Locale | Hyderabad, India |
Transit type | bus rapid transit system |
Operation | |
Began operation | Proposed |
Operator(s) | hyderabad airport metro limited Hyderabad Metropolitan Development Authority |
Technical | |
System length | 20 kilometres (12 mi) |
The Hyderabad BRTS is a planned bus rapid transit system for the Indian city of Hyderabad, India. One corridor has been identified for testing the BRT System. Electrically powered Articulated Buses are being proposed to be used on the corridor.
YouTube Encyclopedic
-
1/3Views:11 1285 8303 532 811
-
How to charge an electric bus?
-
BRT BUS RAPID TRANSIT PESHAWAR new video letest
-
Flywheel Power Multiplication By Chaganti
Transcription
Corridor
The following corridor was identified for BRTS
Corridor: KPHB - JNTU - Malaysian Township - Shilparamam - Mindspace - IIIT - Financial Dist - narsingi - kokapet