To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Envalira Tunnel

From Wikipedia, the free encyclopedia

Envalira Tunnel
Envalira Tunnel is located in Pyrenees
Envalira Tunnel
Envalira Tunnel
Location in the eastern Pyrenees of Europe
Overview
LocationEurope: eastern Pyrenees
Coordinates42°32′24″N 1°43′11″E / 42.540056°N 1.719606°E / 42.540056; 1.719606
StatusOpen 24 hrs/day
StartPas de la Casa, Encamp, Andorra
EndGrau Roig, Encamp, Andorra
Operation
Work begunAugust 1999
Constructed1999–2002
Opened2002
OperatorGlobalvia
TrafficAutomotive
CharacterPassenger & freight
Toll7.00 (one-way), 2022
passenger vehicle
Technical
Length2.050 km (1.274 mi)
No. of lanes2
Operating speed40–70 km/h (25–43 mph)[1]
Highest elevation2,052 m (6,732 ft)
Grau Roig
Lowest elevation2,043 m (6,703 ft)
Pas de la Casa

The Envalira Tunnel (Catalan: Túnel d'Envalira) is a tunnel in Andorra that runs between Pas de la Casa near the Andorra-France border and Grau Roig (Ski resort). It enables its users to avoid the Envalira Pass. It is amongst the highest road tunnels in Europe.

Although situated within the borders of Andorra, the entrance at Pas de la Casa can only be reached via a bridge that is situated in France. The Andorra/France border post is therefore situated 2 km within France, northeast of the access bridge, on RN22. On the French side it is connected to RN22, and on the Andorran side to the CGII.[2]

Plans for a tunnel were developed in Andorra during the late 1950s. In 1963, the Envalira Tunnel design tender was awarded to French engineers Semet and Phillip Studies, and subsequent negotiations were conducted for years and the access roads were improved. On June 1, 1999, Spanish companies FCC and NECSO (today ACCIONA) began construction work on the Grau Roig side of the massif; and on August 2, 1999, work began on the Pas de la Casa side.

YouTube Encyclopedic

  • 1/2
    Views:
    5 169
    575 929
  • [AND] Highest mountain pass in the Pyrenees (2,408 m) - Port d'Envalira + Túnel d'Envalira
  • Geography Now! Andorra

Transcription

Operator & concession

The Tunnel is operated by Net de Gerrers, an alternative asset manager with headquarters in Valencia, Spain, as a toll tunnel. The concession period is for 50 years.[3] The construction cost was 11 Bn Pesetas (approx. 80 Million Euros).[4]

References

  1. ^ "Safety - Tunel Envalira". tuneldenvalira.com. Retrieved 14 January 2014.
  2. ^ "Home - Tunel Envalira". tuneldenvalira.com. Archived from the original on 8 January 2014. Retrieved 14 January 2014.
  3. ^ "Globalvia - Concesiones". globalvia.com. Retrieved 14 January 2014.
  4. ^ Orduña, Maria Cristina (September 2, 1999). "HERMÍNIA SIRVENT Andorra inicia las obras de perforación del túnel de Envalira". El País – via elpais.com.
This page was last edited on 14 January 2024, at 23:56
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.