To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Energy Savings Performance Contract

From Wikipedia, the free encyclopedia

Energy Savings Performance Contracts (ESPCs), also known as Energy Performance Contracts, are an alternative financing mechanism authorized by the United States Congress designed to accelerate investment in cost effective energy conservation measures in existing Federal buildings.[1] ESPCs allow Federal agencies to accomplish energy savings projects without up-front capital costs and without special Congressional appropriations. The Energy Policy Act of 1992 (EPACT 1992) authorized Federal agencies to use private sector financing to implement energy conservation methods and energy efficiency technologies.

An ESPC is a partnership between a Federal agency and an energy service company (ESCO). The ESCO conducts a comprehensive energy audit for the Federal facility and identifies improvements to save energy. In consultation with the Federal agency, the ESCO designs and constructs a project that meets the agency's needs and arranges the necessary financing. The ESCO guarantees that the improvements will generate energy cost savings sufficient to pay for the project over the term of the contract. After the contract ends, all additional cost savings accrue to the agency.[2] The savings must be guaranteed and the Federal agencies may enter into a multiyear contract for a period not to exceed 25 years.

YouTube Encyclopedic

  • 1/3
    Views:
    669
    824
    450
  • Energy Savings Performance Contracting
  • What is an Energy Performance Contract (EPC)?
  • Energy Performance Contract promo

Transcription

NARRATOR Your town or city is spending a lot of money on energy to power municipal buildings, schools, wastewater treatment plants, and other facilities. To help reduce what you're spending, Connecticut now has an innovative program that you can use to complete energy efficiency upgrades with no upfront costs. The State's energy savings performance contracting program provides support for cities and towns. Stamford and East Hartford lead the way by successfully using Energy Savings Performance Contracting before the State's program was developed. MICHAEL WALSH East Hartford in about 2005 got going on an idea that we could catch up on some of this deferred maintenance by investing in capital improvements that saved energy and whereby the energy that was saved, ultimately financed the capital improvement. RICHARD KEHOE Saving money while saving energy just sounds like a great thing for any town. But the town counsel being the town counsel, was skeptical. MICHAEL WALSH Without an energy performance contract, East Hartford would not be in a position to invest $12.3 million dollars. MAYOR LECLERC We are an aging community. The changes that needed to be made to experience the reduction in energy usage needed to happen. NARRATOR As a result of this process, East Hartford has been saving more than $600,000 annually in energy costs. The savings is used to pay the financing cost of the projects. MICHAEL WALSH We financed it with an 11 year lease from the Bank of America. NARRATOR Facility improvements included lighting retrofits, an energy management system, HVAC and burner replacement, and installation of pool covers and solar panels. ALBERT COSTA We are here at our Department of Facilities building and we're looking at a 10KW solar panel project right behind us. It's one of many facility improvement measures that we have accomplished over -- over the past six years. We have done a pool cover, one at the high school, and one at our middle school. The pool cover does surprisingly save us about $10,000 a year in chemicals and evaporation of heat. MARIO TORRES In the past, every month and a half we have to order chlorine and CO2. After the cover was put in, we only order chlorine like every six months and the boiler doesn't seem to be coming on all the time because it doesn't require to be heated constantly. ALBERT COSTA We've accomplished a tremendous amount of facility improvement measures. A lot of items are not glamorous; they are infrastructure improvements that are vital to getting operational costs under control. It's clearly been a success story for the Board of Education in East Hartford as well as the town. NARRATOR Through Energy Savings Performance Contracting, the City of Stamford is able to save more than $720,000 per year in energy costs. Some of the City of Stamford's energy efficiency upgrades were lighting and lighting controls, replacement of boilers and hot water pumps, and the installation of an energy management system. NANCY PIPICELLI In 2002 we entered into a performance contract for 14 of the Stamford Public Schools for $6.1 million dollars. LOUIS CASOLO This was basically a year and a half project, which the larger aspects of the project were done in the summertime. That would be the least disruptive to the schools. And other work such as the lighting retrofits were done in the evening hours. NANCY PIPICELLI And throughout the school we replaced numerous T12 lamps with T8 technology. We also replaced numerous incandescent cans with compact florescent lights and we also replaced exit signs with LED exit signs. The energy savings from this school alone in lighting was $39,000 a year back at the 2002 rate of 10 cents a kilowatt hour. We're here in the boiler room of Cloonan Middle School. All three boilers were replaced. We had four sets of hot water heaters as well as the hot water pumps for the boiler system were replaced. We also installed a new boiler control panel. AL HOYT We used to start out Monday mornings with wooden wedges and we controlled the fresh air dampers in which in turn controlled the heat and cooling in the classrooms to satisfy the rooms and the kids. And now it's all done on a computer, which is much more efficient. NANCY PIPICELLI The performance contract was financed through a third party lease agreement for ten years at 4.35%. We also refinanced that lease to a lower rate after a few years. I think our performance contract was very successful and we are saving more energy than we anticipated and we will into the future. NARRATOR If your town or city would like to get started on Energy Savings Performance Contracting, the State's program will provide technical support, financing advice, a set of standardized contracts, and a list of pre-qualified vendors. Contact us or visit Connecticut's Lead by Example website.  

Federal policies

Energy Savings Performance Contracts are regulations created by the Federal Energy Management Program (FEMP) of the United States Department of Energy (DOE) as required by the Energy Policy Act of 1992. The final DOE ruling came into effect on May 10, 1995. The use of ESPCs by Federal agencies was reauthorized in the Energy Policy Act of 2005 (EPACT 2005) through the end of Fiscal Year (FY) 2016 and permanently reauthorized in The Energy Independence and Security Act of 2007 (EISA).[3]

Energy Performance Contracts are also used extensively in the US Department of Housing & Urban Development's (HUD's) Public Housing Program as a means of reducing utility costs. Unlike federal ESPCs, Public Housing ESPCs are projects approved by HUD and implemented by state-chartered Public Housing Authorities (PHAs) with or without the assistance of an ESCo. Because PHAs are legally authorized to carry debt, ESCos involved in the Public Housing EPC process typically do not need to provide financing to the project, but rather are simply providers of architectural/engineering services.

Impacts of ESPCs

As of March 2010 more than 550 ESPC projects worth $3.6 billion were awarded to 25 Federal Agencies and organizations in 49 states and the District of Columbia (D.C.). These projects saved an estimated 30.2 trillion BTU annually, equivalent to the energy consumed by 318,300, and $11 billion in energy costs, $9.6 billion goes to fund energy efficiency projects and $1.4 billion is reduced Federal Government spending.[4][citation needed]

The initial program was started by John Rogers working for the Naval Facilities Engineering Command. The actual implementation was not started until congress passed the required legislation.

U.S. Department of Energy ESPCs

United States Department of Energy (DOE) energy savings performance contracts are indefinite delivery/indefinite quantity (IDIQ) contracts designed to make ESPCs as practical and cost-effective as possible for Federal agencies. The Department of Energy awarded these "umbrella" contracts to ESCOs based on their ability to meet terms and conditions established in IDIQ contracts. DOE ESPCs can be used for any federally owned facility worldwide.[5][citation needed]

Benefits

DOE energy savings performance contracts help Federal agencies meet energy efficiency, renewable energy, water conservation, and emissions reduction goals by streamlining contract funding for energy management projects. The streamlined financing provides multiple benefits, including:

  • Increased quality and value through:
    • Access to private-sector expertise in energy efficiency, renewable energy, water conservation, and reduced emissions
    • Built-in incentives for ESCOs to provide high-quality equipment, timely services, and thorough project commissioning
    • Infrastructure improvements to enhance mission support
    • Healthier, safer working and living environments
  • Flexible, practical contract and procurement processes to ensures your project, your way
  • Expert, objective technical support through FEMP assistance, including:
    • FEMP-provided legal and financing guidance, project facilitators, advanced technology experts, and training for Federal agencies
  • Smart project management that:
    • Ensures building efficiency improvements and new equipment without upfront capital costs
    • Finances energy improvements without relying on special Congressional appropriations
    • Guarantees energy and related operation and maintenance cost savings
    • Enhances the ability to plan and budget energy, operation, and maintenance accounts
    • Minimizes vulnerability to budget impacts due to volatile energy prices, weather, and equipment failure[6]

Cost[citation needed]

The FEMP ESPC program costs about $10 million annually to administer and an additional $1 million annually to monitor contract performance. On average, FEMP spends about $500,000 to develop each contract, essentially providing a very generous boost to the ESCOs for project development. Additionally, with interest charges over as many as 25 years per contract, the projects are actually costing a lot more than if Congress would just appropriate funding for them rather than financing them over long periods of time.

Performance Issues

FEMP has identified a number of ways to monitor the performance of ESPCs during the life of the contracts. The vast majority of contracts, however, are based on "stipulated" rather the actual measured savings. This means that the parties agree on engineering calculations at the beginning of the contract and never have to measure actual performance after that. A DOE internal study found that with many contracts, it was impossible to tell if performance goals, and thus, dollar savings, were actually being achieved. After just a few years in operation, with staff turnover and other operational issues taking precedence, many of those projects were no longer being monitored. But to this day, the vast majority of ESPC contracts are still based on stipulated, rather than actual measured, performance.

U.S Department of the Army ESPCs

The United States Department of the Army (DOA) use of ESPCs is focused on the reduction of energy and water consumption, with ancillary benefits of achieving facility improvements, improving the quality of life in the Army, and ultimately reducing the overall energy costs of the Installations. ESPCs do not apply to the town of Willington, CT [citation needed].

Energy Performance Contracting in Switzerland

In Switzerland, the swissesco[7] business association is promoting and developing EPC. The business model does support the goals of the Swiss Federal Energy Strategy 2050 by promoting energy efficiency. swissesco was established in September 2015. Its members are energy companies, engineers, financial institutions as well as Cantons, cities and municipalities. The association is supported by the Swiss Federal Office of Energy SFOE and several of the Cantons. swissesco works on the following strategic priorities:

  • Establishment of a business environment that supports the development of the Swiss energy services (ESCO) market as well as concrete EPC projects
  • Standardisation of methodologies and processes
  • Information about Energy Performance Contracting
  • Coordination of activities with other business associations and institutions
  • Establishment and management of a knowledge database for the energy services market

In 2016, swissesco developed the Swiss Guide for Energy Performance Contracting with the support of the Swiss Federal Office of Energy SFOE.[8] It is available in German and French. It explains in detail the planning, development and implementation of EPC projects in Switzerland. In other countries there have been similar efforts in the past, but they did not include the particular legel environment for tendering procedures in Switzerland. The Swiss Guide is comparable to the German document of the Deutschen Energieagentur DENA or the German federal state Hessen as well as to the efforts by the European Energy Service Initiative EESI. The Swiss Guide is free for download and explains how EPC works and what the do's and don'ts are. The public tender procedure is explained step-by-step and illustrated by useful infographics. The Guide also includes useful tools for the analysis and implementation of EPC projects, such as templates for contracts.

References

  1. ^ 10 CFR 436, Subpart B, Final Rule on Energy Savings Performance Contracts
  2. ^ U.S Department of Energy, (2011, February 04). Energy Savings Performance Contracts. Retrieved March 18, 2011, from U.S Department of Energy: http://www1.eere.energy.gov
  3. ^ U.S Department of the Army, (2008). Department of the Army Policy Guidance for Implementation of an Energy Savings Performance Contract. Department of the Army
  4. ^ Steve Cronin (2015). The Case for Energy Savings Performance Contracts in Your Data Center. Schneider Electric Blog: http://blog.schneider-electric.com/government/2015/12/18/the-case-for-energy-savings-performance-contracts-in-your-data-center/
  5. ^ [2]
  6. ^ U.S Department of Energy, (2011, February 04). Energy Savings Performance Contracts. Retrieved March 18, 2011, from U.S Department of Energy: http://www1.eere.energy.gov
  7. ^ "Home". swissesco.ch.
  8. ^ swissesco (2016): Leitfaden Energiespar-Contracting (Schweiz)
This page was last edited on 28 May 2024, at 23:59
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.