To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

DeSoto Next Generation Solar Energy Center

From Wikipedia, the free encyclopedia

DeSoto Next Generation Solar Energy Center
President Barack Obama talks at the DeSoto Next Generation Solar Energy Center
Map
CountryUnited States
LocationArcadia, DeSoto County, Florida, U.S.
Coordinates27°19′N 81°48′W / 27.317°N 81.800°W / 27.317; -81.800
StatusOperational
Commission dateOctober 27, 2009 (October 27, 2009)
Construction cost$150 million
Owner(s)Florida Power & Light
Solar farm
TypeFlat-panel PV
Site area235 acres (95 ha)
Power generation
Units operational90,000 SunPower solar panels
Make and modelsolar cell panel (90000)
Nameplate capacity25 MW
Planned: 300 MW
Annual net output42 GWh
External links
Websitewww.fpl.com/environment/solar/desoto.shtml
CommonsRelated media on Commons

The DeSoto Next Generation Solar Energy Center is a photovoltaic power station in Arcadia, DeSoto County, in the U.S. state of Florida, owned by Florida Power & Light (FPL).[1] President Barack Obama attended the plant's commissioning on October 27, 2009.[2] It has a nameplate capacity of 25 megawatts (MW),[3] and produces an estimated 42,000 megawatt hours (MW·h) of electricity per year (an average output of about 4.8 MW).[4][5]

The plant cost $150 million to construct.[5] The plant consists of over 90,000 SunPower solar panels[3] with single-axis trackers on 235 acres (95 ha).[5]

FPL has to get a permit for construction of the second stage and had filed for the permit to build the third stage of the plant. At the second stage, 49 MW of capacity will be added. At the third stage, 226 MW of capacity is planned to be added bringing the total capacity of the plant up to 300 MW.[5]

YouTube Encyclopedic

  • 1/5
    Views:
    9 636
    1 123
    2 202
    1 341
    685
  • FPL DeSoto Next Generation Solar Energy Center
  • DeSoto Next Generation Solar Energy Center
  • FPL's 'Energy Smart Florida' Smart Grid Announcement
  • FPL's Martin Next Generation Solar Energy Center
  • SurvTech Solutions & The Space Coast Next Generation Solar Energy Center

Transcription

Production

Generation (MW·h) of DeSoto Next Generation Solar Energy[6]
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2009 3,876 3,179 2,415 9,470
2010 3,526 3,038 4,399 5,062 5,307 5,485 4,680 4,682 4,927 4,755 3,849 3,631 53,341
2011 3,167 3,459 5,096 5,923 5,845 3,773 5,042 4,605 4,262 3,842 3,648 3,183 51,845
2012 3,707 3,179 5,239 5,321 5,549 4,364 5,314 4,667 4,156 3,955 3,502 3,095 52,048
2013 3,220 3,528 5,099 4,713 5,508 4,342 4,413 4,748 4,209 4,450 2,813 2,784 49,827
2014 2,888 3,463 4,453 1,702 5,585 4,905 4,870 4,944 3,798 4,600 3,263 2,950 47,421
2015 3,190 3,601 4,532 4,844 6,060 5,098 4,711 4,350 3,878 3,845 3,157 2,770 50,036
2016 2,758 3,465 4,207 4,555 5,536 4,356 5,082 4,241 4,213 4,031 3,413 2,793 48,650
Total 362,638

See also

References

  1. ^ eXenewable Project Profile Page - DeSoto, PV, US
  2. ^ "President Obama joins FPL for commissioning of nation's largest solar PV power plant; announces $200 million in smart grid funding for FPL's 'Energy Smart Florida'". Florida Power & Light. Retrieved 2020-02-12.
  3. ^ a b "FPL Commissions DeSoto Next Generation Solar Energy Center". LCG Consulting. October 28, 2009. Archived from the original on 2011-07-10. Retrieved 2009-11-01.
  4. ^ "DeSoto Next Generation Solar Energy Center FAQs". FPL. Archived from the original on 2009-05-07. Retrieved 2009-11-01.
  5. ^ a b c d Neville, Angela (2010-12-01). "Top Plant: DeSoto Next Generation Solar Energy Center, DeSoto County, Florida". Power. Retrieved 2010-12-18.
  6. ^ "DeSoto Next Generation Solar Energy, Monthly". Electricity Data Browser. Energy Information Administration. Retrieved March 8, 2017.

External links

This page was last edited on 29 July 2022, at 11:09
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.