To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Çanta Wind Farm

From Wikipedia, the free encyclopedia

Çanta Wind Farm
Three windmills in a field at golden hour
The Çanta Wind Farm
Map
Official nameÇanta Rüzgar Enerji Santrali
CountryTurkey
LocationÇanta, Silivri, Istanbul Province
Coordinates41°06′50″N 28°03′30″E / 41.11389°N 28.05833°E / 41.11389; 28.05833
StatusOperational
Construction began2012
Commission dateMay 31, 2014; 9 years ago (2014-05-31)
Owner(s)Boydak Enerji
Operator(s)Boydak Enerji
Wind farm
Typeonshore
Power generation
Units operational19
Make and modelNordex N100/2500
Nameplate capacity19 X 2.5 MW
Annual net output151 GWh
External links
CommonsRelated media on Commons

Çanta Wind Farm is a 2014 wind power plant consisting of 19 wind turbines with a total installed capacity of 47.5 MW. The wind farm is in Çanta in the Silivri district of Istanbul Province, northwestern Turkey.

The wind farm was initially projected by Bora Wind Energy Company in 2011. After Boydak Energy Company took over Bora Co., construction began in 2012. The farm went into production in May 2014 with six turbines, each with a capacity to generate 2.5 MW. By the end of June 2014, eight more turbines were in service, increasing the total installed capacity to 35 MW.[1][2]

YouTube Encyclopedic

  • 1/2
    Views:
    5 118 087
    15 933
  • How's the Weather Song
  • Blowin' in the wind di Bob Dylan

Transcription

Location

The wind farm is located on a 240 m (790 ft)-high hill northwest of Çanta town,[2] just east of the provincial border between Tekirdağ and Istanbul. It is at a distance of 27 km (17 mi) to Çorlu,[3] 17 km (11 mi) to Silivri and 83 km (52 mi) to Istanbul.

Technical details

Maximum power output of each of the 19 turbines supplied by Nordex in Germany is 2.5 MW,[4] and the total annual energy production is about 151 GWh.[2] The turbines of type N100/2500 have 100 m (330 ft) rotor diameter.[3][5]

Average annual wind speed at the site is given with 7.5–8.5 m/s (25–28 ft/s).[3][4]

See also

References

  1. ^ "Boydak Enerji" (in Turkish). Boydak. Retrieved 2015-01-19.
  2. ^ a b c "Çanta Rüzgar Enerji Santrali (RES)" (in Turkish). Enerji Atlası. Retrieved 2015-01-19.
  3. ^ a b c "Nordex liefert 19 Windkraftanlagen in die Türkei" (in German). IWR. 2012-06-04. Retrieved 2015-01-19.
  4. ^ a b "Çanta RES'in türbinleri Nordex'ten" (in Turkish). Yeşil Ekonomi. 2012-06-06. Retrieved 2015-01-19.
  5. ^ "Rüzgar enerji santralinde montaj hız kazandı" (in Turkish). Makina Market. 2013-09-25. Retrieved 2015-01-19.

External links

This page was last edited on 4 March 2023, at 00:08
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.