To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Wilcherry Hill

From Wikipedia, the free encyclopedia

The Wilcherry Hill Project was originally a proposed iron ore mine and associated infrastructure on Eyre Peninsula, South Australia. It was proposed by Ironclad Mining Ltd which later merged with Trafford Resources to become Tyranna Resources. As of 2018, the Wilcherry Project is a joint venture between Alliance Resources (67.35%) and Tyranna Resources (32.65%). The venture is exploring for economic concentrations of any of gold, tin, copper, zinc, lead, silver, iron, bismuth, tungsten and uranium.[1]

Location

The mine site is located approximately 40 km north of Kimba, on central Eyre Peninsula, South Australia. The mine site access road will extend south from the mine site to the township of Kimba.[2]

Mining and processing

The project will consist of two mining stages:

  • Stage 1A – open cut mining of high grade magnetite ore from four primary ore bodies and several associated satellite ore deposits. Processing of this ore will be through dry crushing and screening and dry magnetic separation.
  • Stage 1B – mining and processing of mined and stockpiled lower grade ore using dry processing and an additional wet magnetic separation process.[2]

Product transport and export

With a proposed full production rate of 2 million tonnes per annum and an identified resource of approximately 10 million tonnes, the projected operational life is anticipated to be five years.[2]

Initially the ore was planned to be shipped from Port Adelaide via road, then rail freight.[2] This plan has been abandoned in favour of exporting through Lucky Bay. The existing passenger ferry harbour there will require significant expansion to facilitate the transshipment of iron ore into Panamax or small Capesize vessels.[3]

In August 2014, Ironclad announced that the company was considering selling direct-shipping ore from Wilcherry Hill to Whyalla-based iron ore exporter, Arrium.[4]

Environmental approvals

Ironclad mining received federal environmental approval (with conditions) on 23 September 2011.

Conditions were set in response to the presence of two threatened species within the project area: the slender-billed thornbill and the malleefowl.[2]

References

  1. ^ "Wilcherry Project, South Australia (Alliance 67.35%)". Alliance Resources. Retrieved 4 March 2018.
  2. ^ a b c d e Australian Government - Department of Environment "Ironclad Mining Limited /Mining/Uno Pastoral Station, Northern Eyre Peninsula/SA/Wilcherry Hill Project" Retrieved 2013-11-21.
  3. ^ Lloyd's List Australia "Ironclad drops Port Adelaide, opts for container system at Lucky Bay" Retrieved 2013-11-21.
  4. ^ "Discussions with Arrium regarding potential iron ore sale" (PDF). Ironclad Mining Ltd. 2014-08-21. Retrieved 2014-08-22.
This page was last edited on 15 December 2020, at 23:50
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.