To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Waterloo Wind Farm

From Wikipedia, the free encyclopedia

Waterloo Wind Farm
Turbines in 2010
Map
CountryAustralia
LocationWaterloo, South Australia
Coordinates33°59′S 138°54′E / 33.983°S 138.900°E / -33.983; 138.900
StatusOperational
Construction began2008
Commission dateNovember 2010 and November 2016
Owner(s)Palisade Investment Partners and Northleaf Capital
Wind farm
TypeOnshore
Rotor diameter
  • 90 m (300 ft)
Rated wind speed
  • 15 m/s (49 ft/s)
Power generation
Units operational43
Make and modelVestas
Units planned37 × 3 MW
Nameplate capacity131 MW
External links
Websitehttp://waterloowindfarm.com.au/
CommonsRelated media on Commons

Waterloo wind farm is east of Manoora, South Australia. It is the largest wind farm operated by EnergyAustralia.

YouTube Encyclopedic

  • 1/5
    Views:
    1 098
    16 620
    44 859
    1 668
    14 294
  • Engineer This - Episode 3 - University of Waterloo: UWAFT
  • Quy trình xây dựng một trang trại gió
  • Tiktok Traktör Videoları [Muazzam - yarışma]
  • Fixing Lodging Problems #1054 (Air Date 6-17-18)
  • Distinguished Teaching Award winner 2007, Wei-Chau Xie, Faculty of Engineering

Transcription

Site

The wind farm is positioned along a rocky north–south ridge on privately owned property at Waterloo.[1] The 111 megawatt wind farm spreads across five acres of land and cost about $350 million, it began construction in November, 2008 and has been operational since October 2010.

For about two months in 2013, the site was monitored by the Environmental Protection Authority. The wind farm's infrasound and low-frequency noise were both examined.[2] Acoustics firm Resonate conducted noise and meteorological monitoring in the area.[3]

Turbines

Waterloo wind farm opened with 37 Vestas V90-3MW turbines,[4] each 80 metres high, with each turbine blade 44 metres long and weighing about 8 tonnes. The tower sections weigh approximately 90 tonnes in total with the tower and blades combined weighing 125 tonnes. On average the blades turn at 16.2 rpm. There are four levels in a turbine and it takes about five minutes to get to the top.

Each wind turbine produces on average 24 megawatt hours of electricity each day. On a windy day three wind turbines can power the whole of Clare and the whole wind farm can power up to 163,000 homes or 5 to 10% of South Australia.

The wind farm was expanded with six additional Vestas V117 turbines in 2016 at a cost of A$43 million.[5]

See also

References

  1. ^ "Waterloo Wind Farm". EnergyAustralia. Retrieved 15 July 2015.
  2. ^ Peter Hannam (14 May 2013). "Power giant cuts stake in controversial wind farm". The Sydney Morning Herald. Fairfax Media. Retrieved 15 July 2015.
  3. ^ "Waterloo Wind Farm Environmental Noise Study". Environmental Protection Authority (South Australia). Retrieved 15 July 2015.
  4. ^ "Waterloo Wind Farm, a Roaring 40s success". EcoGeneration. Great Southern Press. Retrieved 15 July 2015.
  5. ^ "About Us". Waterloo Wind Farm. Retrieved 10 August 2019.
This page was last edited on 23 February 2024, at 02:07
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.