To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Visakhapatnam Bus Rapid Transit System

From Wikipedia, the free encyclopedia

Visakhapatnam BRTS
Overview
LocaleAndhra Pradesh, India
Transit typeRapid transit
BRTS road at Arilova comes under simhachalam transist corridor

Visakhapatnam BRTS :-The implementation of the bus rapid transit system has been taken up as a high-capacity public transport system in Visakhapatnam keeping in view the projected multi-fold increase in traffic and constraints of road capacity. A Bus Rapid Transit System (BRTS) was approved for the city under the Jawaharlal Nehru National Urban Renewal Mission. This project was started in 2008 and most of the route has been constructed except for a 2km stretch near Simhachalam.[1] The delay is due to issues in land acquisition from railways, defence and private parties.[2]

YouTube Encyclopedic

  • 1/2
    Views:
    1 225
    32 949
  • Bus Rapid Transit System (BRTS) - Case studies (Ahmedabad, Vishakapatnam) in India
  • Life at IIM Visakhapatnam

Transcription

Corridors

Map

The following two corridors were identified for BRTS by the APSRTC and Greater Visakhapatnam Municipal Corporation.

The two corridors connect Pendurthi to Dwaraka Nagar on two different routes. The Pendurthi Transit Corridor of 22.6 km at an estimated cost of ₹190.97 crore starts at Pendurthi and ends at the Railway Station via Gopalapatnam, NAD X Road, Kancharapalem. The Simhachalam Transit Corridor of 20.5 km at an estimated ₹261.96 crore starts at Vepagunta and goes via Simhachalam, Adavivaram, Hanumanthavaka to Maddilapalem.[3]

BRTS at Rama Talkies road

Bus Rapid Transport System projects of about 42 km in Vizag city at a total cost of about ₹452 crore. The BRTS would be implemented with a joint finance from the Andhra Pradesh government (20 %) and Government of India (50 %) under JNNURM, and GVMC (30 %).

References

  1. ^ Potnuru, Vasu (20 November 2023). "Visakhapatnam: Much-delayed BRTS works pick up pace finally". www.thehansindia.com. Retrieved 29 April 2024.
  2. ^ Rao, J. Umamaheswara (20 September 2016). "Pending works delay BRTS implementation". Deccan Chronical. Retrieved 29 April 2024.
  3. ^ "Vizag, Vijayawada set to get bus rapid transit system". Business Standard.


This page was last edited on 6 June 2024, at 00:44
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.