To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Noto Railway Noto Line
Noto railway NT800
Overview
StatusCeased operation
OwnerNoto Railway
LocaleIshikawa Prefecture
Termini
Stations30
Service
Operator(s)Noto Railway
Rolling stockNT100 series DMU, NT800 series DMU, KiHa 58 series DMU
History
Opened1959
Closed2005
Technical
Line length61.0 km (37.9 mi)
Number of tracksEntire line single-tracked
CharacterRural
Track gauge1,067 mm (3 ft 6 in)
ElectrificationNone
Operating speed80 km/h (50 mph)

The Noto Line (能登線, Noto-sen) was a Japanese railway line of Noto Railway in Ishikawa Prefecture, between Anamizu Station in Anamizu, Hōsu District and Takojima Station in Suzu. This railway line closed on April 1, 2005.

YouTube Encyclopedic

  • 1/3
    Views:
    60 502
    3 071 201
    7 816
  • R 24 MATISA / COLAS RAIL
  • Redmi Note 9 Unboxing And First Impressions ⚡⚡⚡ Upgrade Or Downgrade??
  • BNRI 85 MATISA / Noto Railway

Transcription

Line data

  • Length: 61 km
  • Rail gauge: 1,067 mm (3 ft 6 in)
  • Number of stations: 30
  • Double Track: None (single track)
  • Electrified Section: None (non electrified)

History

The first 22.9-km section of the Noto Line of Japanese National Railways (JNR) between Anamizu Station and Ukawa Station opened on June 15, 1959. It was extended 9.9 km to Ushitsu Station on April 17, 1960, 13.8 km to Matsunami Station on October 1, 1963 and 14.5 km to Takojima Station on September 21, 1964 completing the line of 61.1 km in total, and featuring 49 tunnels in that distance.[1]

Following the privatization of JNR on April 1, 1987, the line was operated by West Japan Railway Company until the company transferred the operation of the line to Noto Railway on March 25, 1988.[1]

The line was closed on April 1, 2005.

Stations

Name Distance (km) Connections Location
Between
stations
Noto
Railway
era
JR
era
Anamizu 穴水 - 0.0 0.0 Noto Railway: Nanao Line Anamizu,
Hōsu District
Ishikawa Prefecture
Nakai 中居 5.3 5.3 5.3  
Bira 比良 2.3 7.6 7.5  
Kanami 鹿波 2.9 10.5 10.5  
Kabuto 3.8 14.3 14.3  
Okinami 沖波 2.7 17.0 17.0  
Maenami 前波 1.1 18.1 18.1  
Furukimi 古君 1.8 19.9 19.9  
Ukawa 鵜川 3.0 22.9 22.9   Noto,
Hōsu District
Shichimi 七見 1.2 24.1 ---  
Yanami 矢波 1.5 25.6 25.6  
Hanami 波並 2.2 27.8 27.8  
Fujinami 藤波 2.2 30.0 30.0  
Ushitsu 宇出津 2.7 32.7 32.8  
Hane 羽根 2.6 35.3 35.4  
Oura 小浦 1.7 37.0 37.1  
Jōmon-Mawaki 縄文真脇 1.4 38.4 38.5  
Tsukumowan-Ogi 九十九湾小木 2.0 40.4 40.5  
Shiromaru 白丸 2.1 42.5 42.6  
Kuri-Kawashiri 九里川尻 1.9 44.4 44.5  
Matsunami 松波 2.0 46.4 46.6  
Koiji 恋路 1.8 48.2 48.3  
Ushima 鵜島 0.8 49.0 49.1   Suzu
Minami-Kuromaru 南黒丸 1.1 50.1 50.2  
Ukai 鵜飼 1.6 51.7 51.8  
Uedo 上戸 2.7 54.4 54.5  
Iida 飯田 1.7 56.1 56.2  
Suzu 珠洲 1.3 57.4 57.4  
Shōin 正院 1.6 59.0 59.1  
Takojima 蛸島 2.0 61.0 61.1  

References

  1. ^ a b Ishino, Tetsu; et al., eds. (1998). 停車場変遷大事典 国鉄・JR編 [Station Transition Directory – JNR/JR] (in Japanese). Vol. I. Tokyo: JTB Corporation. p. 163. ISBN 4-533-02980-9.
This page was last edited on 14 January 2024, at 09:19
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.