To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Dubai Trolley
Exterior Design of Dubai Trolley
Overview
StatusInactive
OwnerEmaar Properties
LocaleDubai, United Arab Emirates
Service
SystemTram
History
Opened2015
Closed2019
Technical
Line length1.1 km (0.68 mi) (Phase I)
4.6 km (2.9 mi) (total)
Track gauge1,435 mm (4 ft 8+12 in)[1]
Operating speed16 kilometres per hour (9.9 mph)[1]

Dubai Trolley is a tram system in Downtown Dubai. It includes a number of trams specially designed for Emaar Properties, with an operational speed of 10 km per hour. The trolleys are double-decker and can convey 50 passengers, who can ride on the open deck or the air-conditioned seating. They convey passengers free of charge.

The Dubai Trolley project was announced by Emaar Properties on 23 April 2008, with opening proposed for the end of 2009.[2] The total cost was put at AED 500 million.[3]

The line on which the Dubai Trolleys travel will be built in three phases which will form a 7 km loop around Downtown Dubai.[1]

As of 2019, Dubai Trolley is out of operation. Poles are located at tracks, tram vehicle number one is displayed to the public in the street, depot is used as a commercial area.

Phase I

Phase 1 opened in 2015. It runs in the median of the orbital Sheikh Mohammed Bin Rashid Boulevard, with three stops serving The Address, the Manzil Downtown and Vida Downtown hotels.[1]

Phase 1 was originally planned to be a 1.1-kilometer (0.68 mi) double track express link shuttle service line operating between the Burj Place interchange station with Dubai Metro and The Dubai Mall operational by end of 2009,[2] but was put on hold in July 2010.

Phase II

Phase 2 will include the full 4.6-kilometer (2.9 mi) loop, providing a single track, mono-directional clockwise commuter service operating to and from the Burj Place interchange station with Dubai Metro.[2] It is expected to serve all ten stations in the network's 500-acre (200 ha) development. The complete one-way journey time will take approximately 8 minutes. Opening was originally planned for 2010.

Trams

The heritage-style open-top double-decker trams built in the US by TIG/m are powered by fuel cells, with batteries used to recover regenerated braking energy.[1]

See also

References

  1. ^ a b c d e "Hydrogen-fuelled double-deck tram on test". Railway Gazette International. 21 April 2015. Archived from the original on 3 August 2020. Retrieved 21 August 2015.
  2. ^ a b c "Emaar unveils advanced public tram system for Downtown Burj Dubai". Gulf News. 23 April 2008. Archived from the original on 21 August 2009. Retrieved 22 July 2009.
  3. ^ Lynne Roberts (24 April 2008). "$136mn tram system to link Downtown Burj Dubai". Arabian Business. Archived from the original on 12 June 2008. Retrieved 22 July 2009.
This page was last edited on 15 February 2024, at 11:25
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.